Photo Credit: Fair Use [17 U.S.C. § 107]
27 Aug 2024 | Abstracted from InsideEVs
"The system at this complex is called Cortex, a "supercomputer cluster"...for video training of the Optimus humanoid robots and the Full-Self Driving (FSD) system...the Texas supercomputer will apparently require 500 megawatts of power in the future."
RSStream
Become a patron and help spread the good news of the world of electric vehicles.
© EVWORLD.COM. All Rights Reserved. Design by HTML Codex