Photo Credit: Fair Use [17 U.S.C. § 107]. Vilnius electric catamaran, one of four to operate on the Neris River.
30 Jun 2025 | Abstracted from LRT
"The first route will link Zirmunai and Zveryna...The trip is expected to take between 45 and 55 minutes.
"The total value for purchasing and servicing four electric boats is 1.85 million euros."
RSStream
Become a patron and help spread the good news of the world of electric vehicles.
© EVWORLD.COM. All Rights Reserved. Design by HTML Codex