info@evworld.com

Photo Credit:Fair Use [17 U.S.C. § 107] Experimental SMR prototype

Big Tech Wants Nuclear-Powered AI Now, But Here's What They're Not Telling Us

30 Jul 2025 | Abstracted from PC Magazine

To power US data centers with the tech would require a large-scale, all-hands-on-deck deployment of (currently non-existent) SMRs in every corner of the grid. That means a flood of funding, the use of legacy reactors in the meantime (hopefully without any accidents), and a lot of luck. In the meantime, the explosive growth in data centers will create distress for local residents, as well as the planet.


PREVIOUS NEXT

    ADDITIONAL RELATED NEWS LINKS


    5366188

    Get In Touch

    Papillion, Nebraska, USA

    info@evworld.com

    SUPPORT EVWORLD

    Become a patron and help spread the good news of the world of electric vehicles.

    Newsletter

    Not yet ready for primetime.

    © EVWORLD.COM. All Rights Reserved. Design by HTML Codex