09 Dec 2024 | Abstracted from Economic Times
"GenCost found that a nuclear SMR over a 60-year timeframe would cost up to 222 Australian dollars ($141.9) per megawatt hour (MWh) of electricity produced...By comparison, it said that a 60-year solar project would generate electricity at a maximum cost of 68 AUD ($43.4) per MWh, including the cost of a complete rebuild after 30 years. A 50-year wind farm, including a rebuild after 25 years, would cost up to 108 AUD ($69) per MWh."Become a patron and help spread the good news of the world of electric vehicles.
Not yet ready for primetime.
© EVWORLD.COM. All Rights Reserved. Design by HTML Codex